Revised plans for the proposed Thirroul Plaza deveopment have been lodged with Wollongong Council.
The main points are:
Break between building D and E increased
Residential parking decreased from 123 to 77
Relocation of residential visitor spaces closer to the common residential lift
Retail parking increased from 198 to 206
Residential lobby from LHD increased in width and brought forward closer to the front boundary
Break in building increased to 14m and shop 6 set back to allow for greater area for outdoor seating
Retail floor levels lifted to comply with flood levels
Shops 1-5 setback further from the front boundary to provide a minimum 4.5m wide footpath
Break between building D & E increased to 14m.
Concierge and mailroom added off King St entrance
Apartments E-201 and E-202 combined in to one 3 bed unit
Window and balcony treatment further refined with greater vertical proportions to openings
The revisions can be accessed at the following link:
Comments powered by CComment